ERP EVALUATION · SAP PMO · CUTOVER · RECOVERY

Senior SAP project leadership, ready from week one.

PMP-certified SAP leads on your side, from the purchase decision to go-live. Your integrator delivers their part; we make sure yours is ready.

100+SAP go-lives as a former SAP VAR
75+SAP migrations
25+SAP program recoveries

U.S.-based, with SAP project experience across the U.S., Europe and the Middle East.

ERP YOUR WAY

Start at the stage you’re in.

Each stage starts with one fixed-scope package and a clear result. Stop there, or stay through go-live — your choice.

 

ERP Your Way

Evaluate

THE PROPOSALS ARE ON YOUR DESK

SAP Evaluation & Readiness

Before you sign, we check your critical processes, interfaces and data against what is being proposed — while you can still change it.

Start with

Readiness Check

2–3 weeks

Fit-to-Gap on your critical processes, a proposal review and the scope conditions for your contract.

31% of complex projects fail to deliver their full intended benefits.1 This is where you can still change that.

 

ERP Your Way

Lead

THE SOW IS SIGNED — NOW IT HAS TO RUN

SAP PMO & Project Management

A PMP-certified SAP lead and a working PMO on your side: plans, decisions and status your steering committee can trust.

Start with

PMO Setup

30 days

Governance and steering cadence, a named project lead, and your plan and status live in our PMO platform.

Plans and gates from more than 100 SAP go-lives we delivered as an SAP VAR.

 

ERP Your Way

Launch

THE GO-LIVE DATE WAS JUST ANNOUNCED

SAP Cutover Management

Cutover plan, rehearsals, data loads and business freeze — with a command center, a clear go / no-go and an independent gate review.

Start with

Cutover Readiness Review

5 days

Your cutover plan, rehearsal results and go / no-go criteria reviewed, with the gaps ranked.

SAP’s own quality guidance recommends independent reviews at quality gates.2 The team that builds the system can’t be its reviewer.

 

ERP Your Way

Recover

STEERING SAYS GREEN. YOUR TEAM SAYS RED.

SAP Project Recovery

Find what is really driving the delay, agree a practical reset and lead it — without stopping the project or replacing the team.

Start with

Recovery Assessment

10 days

Root causes, a reset plan with owners and dates, and a decision you can take to steering.

More than 25 SAP programs recovered — and the same discipline for hypercare after go-live.

FAST LANE

Need a senior SAP lead now?

For programs where the usual project manager isn’t enough — leads who have done it before.

  • Big-bang rollouts across many sites
  • Power, utilities and regulated operations
  • Carve-outs on a fixed date
  • Mergers onto one S/4HANA template
  • Parallel multi-site waves
  • Program takeovers

Roles we fill

  • SAP program / project manager
  • Cutover lead
  • Data migration lead
  • PMO lead

Tell us the role, start date and location. We’ll answer within two business days — including when we’re not the right fit.

Request a senior SAP lead
PROOF

SAP go-lives, migrations, recoveries: we’ve done this before.

Client names are withheld; references are available on request.

100+

SAP go-lives delivered as a former SAP VAR

75+

SAP migrations, from ECC data to S/4HANA

25+

SAP programs recovered

3

regions: the U.S., Europe and the Middle East

POWER GENERATION · U.S. POWER PRODUCER

Critical go-live processes validated before cutover.

Client-side oversight of go-live processes, carve-out concepts and high-availability measures.

ENERGY · INTERNATIONAL ENERGY COMPANY

A verified, consistent data set for S/4HANA go-live.

ECC and legacy data extracted to S/4 migration formats, with orchestrated tests and refresh loads up to cutover.

ERP READINESS · NORTH AMERICAN ORGANIZATION

Readiness and transformation assurance, gate by gate.

ERP readiness, business blueprint and quality gates governed in our PMO platform, with baselines and an AI-assisted critical path.

“N2ONE understood our requirements quickly, delivered reliably, and was easy to work with throughout the engagement.”

Program lead, U.S. federal prime contractor

THE REAL PRICE

Compare the cost of a slip, not the hourly rate.

A senior SAP lead costs more per hour. A late go-live costs more in one week than that difference costs in most of a year.

~60%

of SAP migrations run late and over budget.

The causes: underestimated complexity, scope creep and customization, not technology.3

+30%

longer than planned, on average.

Only 8% of completed S/4HANA transitions finished on schedule.4

Nearshore for the build. Senior leadership for landing it.

Lower-cost teams are the right choice for build capacity. We make sure that capacity is not waiting on decisions, data and testing from your side — the delays no hourly rate can fix.

Start with a fixed-scope step

Every stage starts with a fixed-scope package and a clear result — not open-ended hours.

WHY N2ONE

25 years on every side of SAP projects.

We don’t start with months of discovery. We have seen most SAP problems from the inside, so we start with the fix.

As an SAP VAR

We know how SAP is sold and scoped.

So gaps in proposals, licenses and statements of work show up before they cost you.

As an integrator

We know where projects break.

We have delivered integration, data migration and go-lives ourselves — and recovered programs that slipped.

As an SAP software builder

We know SAP from the inside.

We built SAP-certified integration software, so we understand the system beneath the screens.

As PMP-certified leads

We know how to run it.

Proven SAP methods, plans and quality gates, so your side of the program moves from day one.

WORKS WITH YOUR INTEGRATOR

They build the system. We get your side ready.

Decisions, data, testing and business readiness — the work only you can do, and the work your integrator depends on.

READY FROM WEEK ONE

Your SAP program in one live view.

Every engagement runs in N2ONE Strategy, our own PMO platform: plans, gates, decisions and status that your steering committee, your team and your integrator share. It stays yours.

QUESTIONS

SAP project leadership: common questions.

Short answers to what buyers ask us first. More questions in our FAQ →

What does an SAP readiness check include?

Our Readiness Check takes two to three weeks. We run a Fit-to-Gap on your critical processes, review the proposals on your desk and define the scope conditions for your contract, while you can still change them.

How quickly can you provide a senior SAP project manager or cutover lead?

Tell us the role, start date and location. We answer within two business days, including when we are not the right fit. We fill SAP program and project manager, cutover lead, data migration lead and PMO lead roles.

Do you replace our SAP implementation partner?

No. Your integrator builds the system; we get your side ready: decisions, data, testing and business readiness, the work your integrator depends on.

How long does an SAP cutover readiness review take?

Five days. We review your cutover plan, rehearsal results and go/no-go criteria, and rank the gaps so you know what to fix before go-live.

Can you recover a troubled SAP S/4HANA project without replacing the team?

Yes. Our 10-day Recovery Assessment finds what is really driving the delay and agrees a practical reset, without stopping the project or replacing the team. We have recovered more than 25 SAP programs.

Do you provide independent SAP quality reviews (IV&V)?

Yes. When we review your quality gates, we do not take implementation work on that program. N2ONE is independent and not affiliated with or endorsed by SAP SE.

INDEPENDENT AT THE GATES

SAP recommends independent reviews at quality gates. Who reviews yours?

Independent means not the team that sells, builds or staffs your system. That is the role we take: we review your gates (IV&V) and never take implementation work on the same program. One short call, then a fixed-scope review with a clear result.2,5

  • Nobody yet?Then your go / no-go rests on the team that built the system.
  • Your VAR or integrator says it’s included?A team can’t independently review its own work. That is why SAP’s guidance and public-sector oversight rules keep the two apart.
  • You chose a lower-cost delivery team?Good — then independent gates are how you make sure the savings don’t turn into a slip.

Public-sector agency or prime contractor? Visit our government page →

1 PMI, Pulse of the Profession 2026: complex projects and benefit delivery.
2 SAP, “Active Quality Management — Driving Excellence in Implementations” (2023), Quality Principles 7 and 8: consider independent reviews at important milestones and quality gates. Source.
3 ISG research on SAP migrations, survey of 200 enterprises (2026), as reported by The Register.
4 Horváth study on SAP S/4HANA transformations. Source.
5 California: IT projects the Department of Technology classifies as medium or high criticality require monthly Independent Project Oversight Reports (SAM 4819.36; SIMM Section 45, IT Project Oversight Framework); SIMM 45A provides the state’s IV&V statement-of-work template.
ERP Your Way is N2ONE’s method based on SAP Activate. N2ONE is independent and not affiliated with or endorsed by SAP SE. SAP and SAP Activate are trademarks of SAP SE.